PROJECT SAMPLES

A selection of some of our commercial and industrial projects that we have run alongside our domestic and reactive works.

ed72d038-18c3-4e9b-9b1a-78254149b206.JPG

Costco Wholesale H/O Office Upgrade

Spring/summer 2020

During the Covid-19 pandemic, we have been heavily involved with the upgrading of offices. Re-cabling the entire department to ensure that the admin and management teams can work safely at their desk stations, whilst staying connected virtually. 

Crick .JPG

Costco Wholesale Crick Distribution Centre

Spring/Summer 2020

During the Covid-19 pandemic, we have been restructuring the eComm department to enable an increase in online sales. We have also been separating the conveyor systems, as well as socially distancing the work stations to keep staff safe. 

0178eae7-6dd1-4e00-a5ce-4a6a73aef4d2.JPG

Costco Wholesale (various warehouses)

Spring 2020

We have upgraded the freezer/chiller LED light units for many warehouses nationwide. 

Tyler DB.JPG

Industrial Power Supplies - Bedfordshire

Summer 2020

Design and installation of power cabling and distribution boards to supply entire block of industrial units. 

Coventry power drops.JPG

Costco Wholesale (Coventry)

Autumn 2020

Installation of mass power and data drops across warehouse floor. 

coppinsbridgecomplex.jpg

Coppins Bridge Retail Park - Isle of Wight

Autumn 2019

As the retail park gets set to welcome new retail, food and leisure outlets, we have been involved in the decommissioning of the existing units and new installations of wiring and fire alarm systems. 

IMG_2249_edited.jpg

Costco Wholesale External High Mast Lighting Maintenance/Servicing

Summer/Autumn 2019

Using specialist equipment we serviced the high mast lighting throughout the car parks in Costco warehouses across the country; this entails lowering the entire platform of lighting to assess any faults that need addressing. 

R_edited.jpg

Costco Wholesale Electric Roller Door Systems (various warehouses)

Summer/Autumn 2019

Installation of 3~phase protective switch gear, as well as installing complete cable and containment systems to supply newly installed roller doors at front entrances and in loading bays. 

ecd9b911-5ffd-416e-a0f1-83432ec6a955_edi

Blum (Milton Keynes)

Spring 2019

Installation of LED light strips to front inner cove window areas, including excavation works and cable installation. 

166d5363-bebc-4f20-a8f8-ee7282c02a2e.JPG

The Garage, Wolverton

Winter 2018/19

Installation of EV chargers.

Floor%20sockets_edited.jpg

TK Maxx Admin Office Watford

Summer 2018

Decommissioning of electrical circuits and installation of new power/data cabling, socket floor boxes/socket circuit and protective switch gear. 

Roade garage 2.jpg

Roade Garage

Summer 2017

Overhaul of all electrical installations, as garage resizes and opens new premises. 

Stables.jpg

Stables Theatre

Summer 2017

Installation of mood lighting upon front entrance walkway. 

PHOTO-2020-04-02-21-14-58-7.jpg

12th Street, Theatre District, Milton Keynes

Spring 2017

Electrical and lighting installation as part of the rebranding of the theatre district in central MK.

0845 257 0321

©2020 by www.govier-electrical-engineering.co.uk. Proudly created with Wix.com

This site was designed with the
.com
website builder. Create your website today.
Start Now